Meet EU 2024/1787. EMRES Makes
Compliance Effortless.
The only platform built end-to-end for the EU Methane Regulation — covering LDAR surveys, MRV reporting, venting/flaring monitoring, and third-party verification. Annual MRV reports due 31 May 2026.
Every obligation in EU 2024/1787. Covered.
Six purpose-built modules map directly to the regulation's core requirements for upstream, midstream, and distribution operators.
LDAR Survey Management
Schedule, execute, and document Type 1 (7,000 ppm) and Type 2 (~500 ppm) leak detection surveys across all components per Art. 5–9. Automated repair workflows enforce the 5-day decision and 30-day fix deadlines.
MRV Reporting Engine
Automated measurement, reporting, and verification workflows aligned with OGMP 2.0 Levels 4–5. Generate source-level and site-level methane reports in tonnes CH₄ and CO₂e, ready for competent authority submission per Art. 10–12.
Venting & Flaring Monitor
Real-time tracking of venting and flaring events with automatic alerts when regulatory limits approach. Full incident logging — timestamp, volume, cause, corrective action — for the annual competent authority report per Art. 13–16.
Third-Party Verification Ready
Export structured, audit-ready emissions dossiers for independent verifiers. Pre-built report templates match the verification requirements of Art. 17–20, cutting verifier onboarding from weeks to hours.
Component-Level Emission Tracking
Granular emission source registry covering valves, flanges, joints, connectors, compressors, and pipeline segments. Reconcile source-level measurements with site-level totals and document all discrepancies as required.
Import Due Diligence
For gas importers: track supplier MRV equivalence, manage contract amendment workflows, and generate the annual supply chain information submissions required from May 2025 under Art. 27–29.
EU 2024/1787 Deadline Timeline
Phased obligations 2024–2028. Non-compliance carries penalties up to 20% of annual turnover.
Regulation in force
4 Aug 2024 ✓EU Reg. 2024/1787 entered into force
LDAR programme due
5 May 2025 ✓Submit LDAR programme to competent authority
First Type 2 survey + preliminary MRV
5 Aug 2025 ✓All components surveyed; preliminary quantification report filed
First verified MRV report + venting ban
5 Feb 2026 ✓Source-level annual report verified by accredited third party; routine venting prohibited
Annual MRV report — IMMINENT
31 May 2026 ⚡ IMMINENTSecond annual methane emissions report due to competent authority
Wells mitigation plan
5 Aug 2026Mitigation plan for inactive/temporarily plugged wells submitted
Non-operated assets MRV
5 Feb 2027First verified report for non-operated assets
Methane intensity reporting
5 Aug 2028Importers begin methane intensity reporting for all gas placed on EU market
EMRES AUTOMATES COMPLIANCE ACROSS ALL PHASES
Get compliant before 31 May deadlineOne plan. Full regulation coverage.
Everything gas operators need to comply with EU Regulation 2024/1787.
EMRES Pro
Full EU Regulation 2024/1787 compliance — LDAR, MRV, venting/flaring, verification, and supply chain due diligence in a single platform.
- LDAR programme builder & survey scheduling (Art. 5–9)
- OGMP 2.0 Level 4–5 MRV report generation (Art. 10–12)
- Venting & flaring incident log with authority export (Art. 13–16)
- Third-party verifier export package (Art. 17–20)
- Component registry with source-level reconciliation
- Importer supply chain due diligence module (Art. 27–29)
- Compliance deadline tracker & automated alerts
- Unlimited users & priority support
NO SETUP FEES · CANCEL ANYTIME · SECURE CHECKOUT